ShaneCon collaborated with owner and architect to create an energy efficient, safe with low operating costs structure on a tight site.
Project is construction with using SIP project panels erected on-site with limited space with minimal disturbance to existing store operations or neighbors. Limitations included hill excavations, overhead power lines. Project additionally incorporated a unique heat-treated arbor wood and panels.